EasyManua.ls Logo

Seepex BN 130-6LS - User Manual

Default Icon
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Not Binding Operating
and Assembly Instruction
Progressive Cavity Pump
This operating and assembly instruction is only
for general information.
Type
BN 52-6LS up to 130-6LS
Issue 26.06.2017

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Seepex BN 130-6LS and is the answer not in the manual?

Summary

Safety

Safety and warning notes

Explanation of signal words, symbols, and their meanings for hazard communication.

Warning notes

Details on NOTICE, CAUTION, WARNING, and DANGER signal words and their implications.

Danger symbols

Visual representations of common hazards like suspended loads and electrical voltage.

Information symbols

Pictograms indicating environmental protection and eye protection requirements.

Dangers that can be caused by the machine

Overview of inherent risks from mechanical movements and electrical voltages.

Authorised people

Defines requirements and responsibilities for personnel undertaking operation, setup, and maintenance.

Safety notes for maintenance, inspection and assembly work

Critical safety procedures for maintenance, including depressurization and decontamination.

Transport, Intermediate storage, Disposal

Sling points (AP) for lifting devices

WARNING for suspended loads and proper use of lashing points.

Assembly; Installation

Mounting tools; lifting gear

CAUTION about pump falling over and selecting appropriate tools.

Power supply of the seepex pump

DANGER notice for electrical supply, emphasizing type plate and safety regulations.

Commissioning; De-Commissioning

Measures before commissioning

Checks and procedures before initial pump start-up.

Protective devices on the pump

DANGER regarding missing protective devices and requirements for touch protection.

Electrical;hydraulic connections

DANGER for electrical hazards and securing connections.

Initial commissioning;repeated commissioning

Procedures for starting the pump for the first time or after recommissioning.

Avoiding dry running of the pump

NOTICE to fill pump with liquid to prevent stator damage.

Switching off the pump

DANGER for electrical hazards during pump shutdown.

Maintenance

Preventive measures

DANGER for electrical hazards and requirements for maintenance personnel.

Joint grease

Exclusively use seepex special grease to avoid damage.

Pump Dismantling; Reassembly

Pump with Smart Conveying Technology - SCT

Overview of dismantling and reassembly procedures for SCT pumps.

Rotating unit - individual parts

Detailed steps for dismantling and preparing individual components of the rotating unit.

Holding band - assembly

Step-by-step guide for correctly assembling and tensioning the holding band.

Seepex BN 130-6LS Specifications

General IconGeneral
BrandSeepex
ModelBN 130-6LS
CategoryWater Pump
LanguageEnglish

Related product manuals