IN0051 Revision 06 (005293)– 1 of 14
POWER PERFORMANCE PASSION
SP PRO Series 2i Managed Batteries
Installation Note
SP PRO Series 2i Managed Batteries Installation
Introduction
This instruction will show how to setup and install a managed Lithium battery with a Selectronic SP PRO
Series 2i in either a single phase system or Advanced Multiphase system (Three phase or Split phase).
NOTES:
• When installing an Advanced Multiphase system, also refer to installation guide:
IN0052_xx Installation of an Advanced Multiphase system.
• In an Advance Multiphase system the CAN bus cable is ONLY connected from the battery bank to
the L1 SP PRO. There is no connection to the CAN on either the L2 or L3 SP PRO.
Refer to the table below to understand which installation kit is the right choice for your application.
Note that the table below is equally applicable to both on-grid and off-grid systems.
Installation Kit Order code for
each System Application
BYD B-Plus 2.5 modules
(in B-Box RES or PRO),
B-Plus L 3.5 modules,
Battery-Box Pro 13.8,
Battery-Box Pro 16.5
Sonnenschein@home
Lithium 6.8 or 9.0
Needs 200A HRC fuses,
not supplied with battery.
LG Chem RESU 3.3, 6.5, 10, 13
LG Chem Stand-Alone modules
(Rack Mount)
Needs optional cable “CAN RJ45-DB9
LM CS1022_01” stock code 005289
P – The pre-charge/Battery sense wiring must be installed when using a BYD battery in an Advance
Multiphase (AMP) system. See Installation note
IN0052_xx 005303 Installation of an Advanced
Multiphase system.
S – The battery fuse or circuit breaker must be turned ON before the battery bank is started (button
press on the master battery) when using the LG Chem Standalone modules.