EasyManua.ls Logo

Sentek Drill & Drop - Page 28

Default Icon
98 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6. Augering
This enables movement of the soil from the auger flight upwards and out of the drilled hole.
Note: The auger might be damaged if run in reverse!
Move constantly
up and down
(10-15cm) during drilling.
Insert the auger into the centre of the tripod keeping it as straight as possible. Start the drill and move the
auger constantly and gently 10 – 15 cm up and down during the drilling process.