EasyManua.ls Logo

Serco SafeTFrame AB Series - User Manual

Default Icon
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...

















Questions and Answers

Summary

Introduction and Safety

Introduction

Welcome and purpose of the manual, covering installation, operation, and maintenance.

Safety Signal Words

Explains hazard terms like DANGER, WARNING, CAUTION, and NOTICE used in the manual.

Safety Practices

Owners Responsibilities

Technical Specifications

Ramp and Lip Grades

Table detailing ramp and lip grade values for various vehicle bed positions and leveler lengths.

Installation Guide

Pit Preparation and Leveler Checks

Pre-installation checks of the pit, electrical service, and the leveler itself.

Leveler Placement and Initial Setup

Steps for inserting the dock leveler into the pit and initial connections.

Frame Leveling and Securing

Procedures for leveling the rear frame and tack welding it to the pit curb angle.

Front Frame Adjustment and Welding

Adjusting and securing the front frame, including shimming.

Installation Troubleshooting

Solutions for common problems encountered when fitting the leveler into the pit.

Service and Maintenance Tools

Service Tools and Safety Precautions

Description of tools for maintenance and critical safety precautions.

Pan Removal Tool Usage

Procedure for using the pan removal tool for pit cleaning access.

Component Identification

Dock Leveler Parts Diagram

Labeled illustration identifying the main components of the dock leveler.

Electrical Wiring Diagram

Single Phase Wiring Details

Electrical connection diagram for the 115V, single phase, 50/60 Hz unit.

Operating the Dock Leveler

Introduction to Operation

Basic function and design overview of the Serco AB dock leveler.

Raising and Lowering Operations

Step-by-step guide for operating the dock leveler's ramp and lip.

Storing and Special Loading Modes

Procedures for returning the leveler to its stored position and for end loading.

Planned Maintenance Program

Maintenance Schedule and Tasks

Details weekly, quarterly, and specific maintenance actions for the dock leveler.

Troubleshooting Guide

Problem Diagnosis and Solutions

Common operational issues with the dock leveler and their corresponding solutions.

Lip Latch Adjustments

Lip Latch and Spring Calibration

Adjusting the lip latch mechanism and spring for proper lip extension and retraction.

Parts Lists

Dock Leveler Assembly Parts

Detailed part numbers for the main dock leveler unit.

Air Bag and Pan Assembly Parts

Parts specific to the air bag and pan assembly components.

Fan and Piping Assembly Parts

Parts list for the fan motor, filter housing, and piping.

Optional Sealing System Parts

Parts list for the optional Energy Guard® dock leveler sealing system.

Warranty Information

Limited Warranty Terms

Details of Serco's limited warranty for the dock leveler and its components.

Serco SafeTFrame AB Series Specifications

General IconGeneral
Platform SizeVarious sizes available
PowerElectric or hydraulic
Frame HeightCustomizable
Frame WidthCustomizable
MaterialHeavy-duty steel
Safety Featuresemergency stop
WeightVaries by model