ASSEMBLING THE POOL BASE
PĂƟŽstones installaƟŽŶ
Concrete paƟo stones may be placed at the base of each upright of your pool.
Each boƩom plate will show the locaƟon for a paƟo stone. Make a mark on the
ground at each base plate. Remove the boƩom rails and boƩom plates and lay out
the paƟo stones around the circle where the boƩom plates were.
The paƟo stones must be dug into the ground so the tops are Ňush with the
soil around them (image 4). Use the carpenter’s level or a transit to make sure
the paƟo stones are perfectly level and Ňush with the ground. Use either the car-
penter’s level and a 2-by-4 (5cm x 10cm) wood plank, or the opƟcal level between
paƟo stones to make sure the stones are level with each other. (image 5)
Do not install blocks or rails on loose siŌed soil or sand. There must be no space
between the ground and the boƩom of the rails. All paƟo blocks must be Ňush
with the ground, solid and level with each other in all direcƟons