VC-MH80
VC-MH90
ASSEMBLE THE MECHANISM’S PARTS
RE-
QUIRING
THE PHASE MATCHING IN THE
STEPS BELOW.
1. Assembling the pinch roller assembly and the
pinch drive cam (on the front of the mechanism
chassis).
0
insert Pinch Drive Cam.
A
Fit the point of the pinch drive cam to the
fourth tooth of the pinch
drive
lever,and
insert the pinch drive cam.
2. Mounting the shifter (on the back of the mecha-
nism chassis).
3. Mounting the master cam (on the back of the
mechanism chassis).
Pinch Drive Cam
4. Mounting the connection gear, slow brake and
loading motor assemblies (on the back of the
mechanism chassis). ,
II
1. Assembling the pinch roller assembly
and’the pinch drive cam (on the front of
the mechanism chassis).
Place the following parts in
po+tion
‘in numerical
order.
(1) Pinch drive cam
0’
(2) Pinch roller and pinch double-action lever
8
(3)
Open lever
0
Fit the pinch drive cam
part
and the
chassis position.
Figure
4-46-l.
Figure
4-45.
26