EasyManua.ls Logo

Sharp VH-25 Series - Page 27

Sharp VH-25 Series
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATOR’S MANUAL
P 24 / 57
A Trouble Shootings:
1 Repiacement of V-Belt and Timing Belt of LC-20VC Miller:
a. Take up the wire grip and reversing switch.
b. Take off the side cover of belt wheel housing.
c. As illustrated Fig.25, loosen adjusting motor handle ( B ) and move the motor forward to
loosen the belt. Turn the V-Belt and let it slip off the belt wheel.
d. Take off the two hexagonal nuts ( C ) for motor dismounting.
e. Take out the drawbar ( D ) and drop the quill down to the lowest position.
f. Push the hi-low speed selector (E) to the right front position.
g. Dismantle the six concave bolts (H) connecting the belt housing (F) and gear housing (G).
Strike upward the belt housing. V- Belt and timing belt are therefore replaced.
h. Reverse the aforesaid steps and restore the mechanism once both belts are replaced.
NoteReplacement of V-Belt and timing belt shall conform to the manufacturer's specs.
Fig.25

Related product manuals