EasyManua.ls Logo

ShelterLogic Greenhouse-in-a-Box Easy Flow User Manual

ShelterLogic Greenhouse-in-a-Box Easy Flow
15 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
05_70658_A317/12/13
x2
+
Greenhouse-in-a-Box
®
Easy Flow
TM
10' x 20' x 8'
/
3 x 6,1 x 2,4 m
#70658
150 Callender Road
Watertown, CT 06795
www.shelterlogic.com
1-800-524-9970
1-800-559-6175
Canada:
TEMPORARY STRUCTURE
STRUCTURE TEMPORAIRE
ESTRUCTURA TEMPORAL
+
/
-
18"
45 cm
7
/
16
"
11
mm
20'
6
m
+
/
-
x2
Question and Answer IconNeed help?

Do you have a question about the ShelterLogic Greenhouse-in-a-Box Easy Flow and is the answer not in the manual?

ShelterLogic Greenhouse-in-a-Box Easy Flow Specifications

General IconGeneral
TypeGreenhouse
BrandShelterLogic
ModelGreenhouse-in-a-Box Easy Flow
CategoryTent
Frame MaterialSteel
Cover MaterialPolyethylene
UV ProtectionYes
VentilationRoll-up side panels
AssemblyTool-Free Assembly

Summary

Proper Handling and Consumer Responsibility

Parts Replacement and Assembly

Section A Assembly

Main Frame Assembly

Illustrates the assembly of the main frame structure using specific parts and fasteners.

Section C Frame Joining

Frame Component Connection Steps

Detailed steps for joining various frame components using connectors and fasteners.

Section D Frame Reinforcement

Adding Structural Reinforcement

Adding further structural elements to reinforce the frame assembly.

Section E Dimension Check

Dimension Verification and Anchoring Prep

Checking frame dimensions and preparing for anchoring.

Section F Ground Anchoring

Ground Anchor Installation

Detailed instructions for installing ground anchors for stability.

Section G Cover Panel Installation

Attaching First Cover Panel

Installation of the first cover panel onto the frame structure.

Securing Cover Panel Attachment

Methods for securely attaching the cover panel to the frame.

Section H Tent Side Securing

Securing Tent Sides

Securing the sides of the tent structure for stability.

Section I Tensioning Straps

Tensioning Strap Adjustment

Detailed steps for adjusting and securing tensioning straps.

Section J Support Ropes

Support Rope Installation

Instructions for installing support ropes for added stability.

Section K Frame Reinforcement

Frame Connections and Reinforcement

Detailed steps for connecting frame parts and reinforcement.

Section L Side Flaps

Side Flap Installation

Instructions for attaching and securing side flaps to the structure.

Section M Front Panel Adjustment

Front Panel Fitting and Adjustment

Steps for adjusting and fitting the front panel of the structure.

Section N Front Panel Securing

Final Front Panel Securing

Final steps to secure the front panel of the structure.

Related product manuals