EasyManua.ls Logo

SHOCKERHITCH AIR EQUALIZER User Manual

SHOCKERHITCH AIR EQUALIZER
2 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SHOCKERHITCH®
AIR EQUALIZER SHOCKERHITCH
SETUP INSTRUCTIONS
Thank you for choosing a SHOCKERHITCH
Installation:
Page 1
STEP 1
Measure your existing ball height from the
ground for future reference.
STEP 2
Remove your weight distribution head from
existing shank.
STEP 3
Assemble the Air Equalizer Shockerhitch to the
Shocker XR adjustable channel using supplied
5/8" pins. Slide assembly into the receiver tube
on tow vehicle.
STEP 4
Install your existing weight distribution head on
the Air Equalizer bar using your original
mounting bolts.
Question and Answer IconNeed help?

Do you have a question about the SHOCKERHITCH AIR EQUALIZER and is the answer not in the manual?

SHOCKERHITCH AIR EQUALIZER Specifications

General IconGeneral
BrandSHOCKERHITCH
ModelAIR EQUALIZER
CategoryAutomobile Accessories
LanguageEnglish

Summary

Setup Instructions

Step 1: Measure Ball Height

Measure existing ball height from the ground for future reference.

Step 2: Remove Weight Distribution Head

Remove your weight distribution head from the existing shank.

Step 3: Assemble Shockerhitch

Assemble the Air Equalizer Shockerhitch to the adjustable channel using supplied 5/8" pins.

Step 4: Install Weight Distribution Head

Install your existing weight distribution head on the Air Equalizer bar using your original mounting bolts.

Step 5: Remeasure Ball Height

Remeasure ball height and select pin location on channel mount matching original measurement.

Step 6: Hook Up Weight Distribution Bars

Hook up your weight distribution bars as before, potentially removing air from the equalizer.

Setting Air Pressure

Safety Notice

Maintenance