EasyManua.ls Logo

SHOTO SDA10-4850 User Manual

Default Icon
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Question and Answer IconNeed help?

Do you have a question about the SHOTO SDA10-4850 and is the answer not in the manual?

SHOTO SDA10-4850 Specifications

General IconGeneral
ModelSDA10-4850
CategoryCamera Accessories
Voltage48V
Operating Temperature-20°C to 60°C
Waterproof RatingIP65

Summary

Safety & Warning

Product Introduction

Applications & Advantages

Details the applications of SDA10 series LiFePO4 battery and its key advantages like high energy density and long life.

Product Features

Describes the Shoto SDA10 series battery as LiFePO4, its anode/cathode, capacity options, rack size, and BMS features.

Dimension & Capacity

Provides a table listing various SDA10 models with their voltage, capacity, dimensions, weight, and remarks.

Front Panel Appearance

Shows a diagram illustrating the layout and components on the front panel of the SDA10 series battery.

Front Panel Layout & Details

Details each component marked on the front panel, including its function and specific information.

LED Indicator Description

Explains the meaning of different LED states (RUN, ALM, SOC) for various operational statuses.

Instruction for ADD Dip Switch

Guides on setting up the ADD Dip Switch for communication address numbers in multi-pack configurations.

Transportation & Storage Instruction

Transportation Instruction

Provides guidelines for safely transporting the battery pack, emphasizing protection from environmental factors and mishandling.

Storage Instruction

Details recommended storage conditions, temperature, humidity, SOC, and periodic maintenance for long-term storage.

Installation & Commissioning

Unboxing

Details the steps for unboxing the battery pack from its packaging, including wooden and paper cartons.

MOP for New Battery Installation

Provides Method of Procedure (MOP) for installing new battery packs, covering rack insertion, cabling, and grounding.

Battery Commissioning

Outlines the steps for commissioning the battery system, including PSU parameter setup, alarm checks, and power-on procedures.

Installation Checklist

Prepare Installation Checklist

Instructs on filling out the installation checklist after stable operation, using an Excel form for verification.

Battery Charge/Discharge

Charging Instruction

Details recommended charging current, setup limits, and how to determine if the battery is fully recharged.

Discharging Instruction

Guides on performing battery discharge tests, setting discharge current, and calculating capacity based on duration.

Related product manuals