EasyManua.ls Logo

SHOTO SDA10 Series User Manual

SHOTO SDA10 Series
49 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Question and Answer IconNeed help?

Do you have a question about the SHOTO SDA10 Series and is the answer not in the manual?

SHOTO SDA10 Series Specifications

General IconGeneral
ModelSDA10 Series
CategoryCamera Accessories
TypeSolar Power Bank
Capacity10000mAh
LED IndicatorYes
Output5V/2.1A
Input5V/2A
MaterialABS

Summary

Safety & Warning

Product Introduction

Applications & Advantages

Lists applications and key advantages of the SDA10 series battery module.

Product Features

Details the LiFePO4 chemistry, capacity options, and built-in BMS features of the battery.

Dimension & Capacity

Provides a table of model specifications including voltage, capacity, dimensions, and weight.

Front Panel Appearance

Illustrates and labels the components on the front panel of the battery pack.

Front Panel Layout & Details

Explains the function and marks of each front panel component for clarity.

LED Indicator Description

Defines the meaning of the RUN, ALM, and SOC LED indicators for system status.

Instruction for ADD Dip Switch

Guides on configuring communication addresses using the ADD dip switch settings.

Transportation & Storage Instruction

Transportation Instruction

Provides guidelines for safe transportation of the battery pack, covering handling and protection.

Storage Instruction

Outlines recommended storage conditions, temperature, humidity, and maintenance.

Installation & Commissioning

General Installation Safety & Environment

Covers safety precautions, handling, and operational environment for battery installation.

Installation Tools Requirements

Lists essential tools for installation and highlights the importance of insulated tools.

Unboxing

Details the procedures for unpacking the battery module from its packaging.

MOP for New Battery Installation

Provides the Method of Procedure for installing new battery packs correctly.

Battery Commissioning

Covers the final setup, parameter configuration, and power-on steps for the battery system.

Installation Checklist

Prepare Installation Checklist

Instructs on filling out the installation checklist after system setup and commissioning.

Battery Charge/Discharge

Charging Instruction

Provides guidelines for charging the battery, including current limits and verification methods.

Discharging Instruction

Outlines the procedure for discharging the battery for capacity testing and calculation.

Related product manuals