EasyManua.ls Logo

Siemens A70 - Page 34

Siemens A70
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A70 Level 2 Service Manual
Copyright © Siemens Pte Ltd.
All Rights Reserved Mai 2005
COM D CCQ SLI APAC Page 34 of 36 Internal Use Only
Final Inspection:
The final inspection contains:
1) A 100% network test (location update, and set up call).
2) Refer to point 3.3.
3) A random sample checks of:
- data reset (if required)
- optical appearance
- complete function
4) Check if PIN-Code is activated (delete the PIN-Code if necessary).
Basis is the international standard of DIN ISO 2859.
Use Normal Sample Plan Level II and the Quality Border 0,4 for LSO.
Remark: All sample checks must be documented.

Other manuals for Siemens A70

Related product manuals