GEAFOL- / CARECO-Cast-resin Transformer/ Operating Instructions
© 2021 Siemens Energy Page 2
Copyright: The copyright to these operating instructions is held by Siemens Energy AG.
These operating instructions must not be wholly or partly reproduced for competitive purposes, used in any unau-
thorized way or made available to third parties without agreement of Siemens Energy AG
siemens-energy.com
Connecting
Page 14
6.1 Connection routing
6.2 Connection of high voltage (HV)
6.3 Connection of low voltage (LV)
6.4 Surface preparation
6.5 Fastenings
6.6 Contact pressure
6.7 Grounding of transformers
6.8 Temperature monitoring
6.9 Monitoring devices (Option)
6.10 Siemens Energy Sensformer® (Option)
6.11 Fan (Option)
6.12 Cooler (Option)
6.13 Change in operating voltage
siemens-energy.com
General information and safety notes
Page 4
1.1
General information
1.2
1.3
1.4
1.5
Particular types of hazards
1.6
Occupational safety and protective
Equipment
Scope
Page 7
Usage
Page 7
3.1
Classification in accordance to
IEC 60076-11
Description
Page 9
Transport, goods receipt, storage
Page 10
5.1
Unloading, lifting by crane
5.2
Transport by road and sea
5.3
Unloading and lifting with forklift truck
5.4
Moving, placement
5.5
Unpacking, examination
5.6
Storage
5.7
Covers on high-voltage tappings and
tubes of delta connection
5.8
Disassembly of delta connections
5.9
Setting up
5.10
Minimum clearances
5.11
Ventilation of the transformer room
Commissioning
Page 18
Inspection and cleaning
Page 19
Faults, causes and remedies
Page 20
Recycling and disposal
Page 21
Relevant standards
Page 21
EC declaration of conformity
Page 22