Fasten the guide frame to the rear wall of the switchboard panel with 4 screws (included
in the scope of delivery) with a tightening torque of 21Nm.
Insulating plate for extended front terminals, to be provided by the customer
2. Ensure that the guide frame is grounded (see Chapter Power supply, grounding, and
connection (Page142)).
3. Screw the busbars/cables of the main conducting paths to the connections of the
withdrawable breaker version (for tightening torques, see table Tightening torques at a
glance (Page154)).
Note the operating instructions of the relevant connection system (see Chapter Reference
documents (Page10)).
4. Mount the armature plates for protection from short-circuits (see Chapter Armature plates
(Page149)).
5. Insert the circuit breaker into the guide frame (see Chapter Racking the circuit breaker
(withdrawable breaker) (Page188)).
Connection and commissioning
5.2Mounting and connecting the device
3VA27 molded case circuit breakers & 3WL10 air circuit breakers