EasyManua.ls Logo

Siemens SICHARGE UC 150 UL

Siemens SICHARGE UC 150 UL
122 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
INSTALLATION AND OPERATIONS MANUAL
SICHARGE UC 150 UL
Plug-in Dispenser
January 
usa.siemens.com/sichargeuc

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Siemens SICHARGE UC 150 UL and is the answer not in the manual?

Siemens SICHARGE UC 150 UL Specifications

General IconGeneral
BrandSiemens
ModelSICHARGE UC 150 UL
CategoryDispenser
LanguageEnglish

Summary

Legal Information and Warnings

Warning Notice System

Explains the grading of warning notices (DANGER, WARNING, CAUTION, NOTICE).

Qualified Personnel

Defines qualified personnel for operating the product.

Proper Use of Siemens Products

Notes for proper usage and recommendations.

Trademarks

Mentions registered trademarks of Siemens AG.

Disclaimer of Liability

States limitations on consistency and liability.

Introduction to Operating Instructions

FCC Compliance

Equipment tested and found to comply with FCC Part 15 limits.

Safekeeping and Using the Operating Instructions

Requirements for keeping and using the manual correctly.

Open-Source Software

Information on open-source software used in the firmware.

Security and Data Protection

Security Information

Information on industrial security functions and recommendations.

General Data Protection Regulation

Siemens' data protection principles and product's data handling.

Safety Instructions and Guidelines

Basic Safety Instructions

General safety guidelines and regulations to follow.

Intended Use

Specifies the product's intended use for charging electric vehicles.

Qualified Personnel Requirements

Requirements for personnel performing work on the dispenser.

Fire and Explosion Protection

Precautions regarding flammable liquids and ignition sources.

Device Protection and Alterations

Protection Against Ingress of Liquid

Protection standards and precautions against water ingress.

Protection Against Unauthorized Opening

Security measures for device access.

Device Alterations and Undamaged Equipment

Prohibition of unauthorized modifications and use of undamaged parts.

Electrical Safety Rules

Five Safety Rules for Electrical Work

Rules for securing electrical systems before and after work.

Safety Signs

Lists safety signs on packaging and inside the dispenser cabinet.

Industrial Security and Device Identification

Industrial Security

Siemens' approach to industrial security and product updates.

Device Identification Nameplate

Details found on the device's nameplate and its position.

Product Description and Variants

Product Overview

General description of the SICHARGE UC dispenser's function.

Performance Features

Key features of the SICHARGE UC dispenser.

Different Versions and Mounting

Information on available versions and mounting variants.

Application Areas

Intended areas of use for the SICHARGE UC dispenser.

Dispenser Variants and Structure

Overview of Variants for Floor Mounting

Comparison of floor mounting variants.

Overview of Variants for Wall Mounting

Comparison of wall mounting variants.

External Structure

Details of the dispenser's external structure and controls.

LED Display

Explains the meaning of different LED indications.

Dispenser Components and Internal Structure

HMI Screen Operation

Features and adjustments of the HMI screen.

Lock System and Cable Holder

Security feature and storage for charging plug and cable.

Internal Structure

Shows the internal components of the dispenser.

Charging Cable Type 1

Details about the charging cable and its standard compliance.

Charging Contacts and Cable Features

Charging Contacts Explanation

Explains the function of each contact on the CCS1 connector.

Locking Mechanism

Mechanism for securing the charging connection.

Temperature Monitoring

How temperature monitoring ensures safe charging.

Charging Cable Performance Features

Technical specifications of the charging cable.

Electrical Protection and Monitoring

Electrical Protection Devices

Overview of protective devices within the dispenser.

Overvoltage Protection

How upstream charging station provides overvoltage protection.

Overload Protection

System for monitoring and preventing overloads.

Insulation Monitoring

Insulation Monitoring Function

How insulation monitoring prevents ground faults.

Application Planning - Incoming Inspection

Checking Delivery for Completeness

Steps for verifying delivery contents against documents.

Additional Material and Disclaimer

Lists documents and disclaimer for device use.

Transport Packaging Inspection

Checking the Tilt Indicator

How to check the tilt indicator on packaging.

Overall Transport Packaging Check

Visual inspection of the entire transport packaging.

Unpackaging Procedures

Removing Packaging for Road Transport

Steps to remove road transport packaging.

Removing Packaging for Air Transport

Steps to remove air transport packaging.

Removing Packaging for Sea Transport

Steps to remove sea transport packaging.

Reporting Damage and Location Planning

Reporting Missing Components or Transport Damage

Procedures for documenting and reporting delivery issues.

Location Planning Requirements

Requirements for selecting a safe installation location.

Accident Risks and Corrosive Environments

Measures to avoid accidents and notes on corrosive environments.

Mounting Surface and Clearance Requirements

Safe Location Selection Criteria

Criteria for choosing a safe installation location.

Mounting Surface Properties

Requirements for floor and wall mounting surfaces.

Installation Clearances and Airflow

Minimum Clearances for Floor Mounting

Required clearances for floor-mounted dispensers.

Minimum Clearances for Wall Mounting

Required clearances for wall-mounted dispensers.

Maximum Allowable Temperature and Airflow

Limits for ambient temperature and airflow notes.

Electrical Installation and Cable Routing

Auxiliary and Direct Voltage Connections

Connecting to low-voltage and direct voltage networks.

DC Cable Routing for Radio Interference Prevention

Recommendations for routing DC cables to minimize interference.

Ethernet and Fiber-Optic Cable Routing

Specifications for Ethernet and fiber-optic cable routing.

Grounding and Cable Routing Considerations

Requirements for grounding and general circuit routing.

Bumper Installation

Bumper Installation for Protection

Installing a bumper for protection against vehicle impact.

Preparing Mounting Surfaces

Preparing for Floor Mounting

Steps to prepare the floor for dispenser mounting.

Cable Entry Position for Floor Mounting

Shows the position of the cable entry from below.

Secure Work Area for Mounting

Importance of securing the work area.

Floor Fixing and Preparation

Drill Holes for Floor Fixing Points

Specifies drill hole locations for floor mounting.

Fixing to the Floor

Recommended fixing materials for floor mounting.

Preparing for Wall Mounting

Preparing for Wall Mounting

Steps to prepare the wall for dispenser mounting.

Cable Entry Position for Wall Mounting

Shows cable entry positions for wall mounting.

Wall Mounting Installation

Installing Anchors for Wall Mounting

Procedure for drilling holes and installing anchors for wall mounting.

Hanging the Dispenser on the Wall

Steps to hang the dispenser on the wall mount brackets.

Dispenser Storage

Proper Storage Conditions

Conditions for the storage location.

Risks of Improper Storage

Risks associated with improper storage.

Transporting the SICHARGE UC Dispenser

Long-Term Storage Considerations

Considerations for storing the dispenser for extended periods.

General Transporting Guidelines

Safety warnings and guidelines for transporting the dispenser.

Transporting with Pallets

Steps for transporting the dispenser using a forklift.

Lifting for Floor and Wall Mounting

Lifting procedures for floor and wall mounting.

Installation Safety Instructions

General Installation Safety

Safety guidelines for installing the SICHARGE UC dispenser.

Installation Precautions

DC Cable Routing for Radio Interference

Measures to prevent radio interference from DC cables.

Mounting Safety Areas and PPE

Safety areas and PPE requirements for mounting.

CrushingCutting Risk during Mounting

Precautions for moving parts and cables during mounting.

Grounding and Mounting Procedures

Grounding Instructions

Requirements for grounding the unit.

Floor Mounting Procedure

Steps for mounting the dispenser on the floor.

Lifting Dispenser for Floor Mounting

Procedures for lifting the dispenser off the pallet.

Required Tools and Fasteners for Floor Mounting

Tools and materials needed for floor mounting.

Dispenser Mounting and Wall Installation

Mounting the SICHARGE UC Dispenser (Floor)

Detailed steps for positioning and securing the dispenser on the floor.

Wall Mounting Procedure

Procedures for mounting the dispenser to a wall.

Lifting Dispenser for Wall Mounting

Procedures for lifting the dispenser for wall mounting.

Wall Mounting Tools and Fasteners

Required Tools and Fasteners for Wall Mounting

Tools and materials needed for wall mounting.

Mounting the SICHARGE UC Dispenser (Wall)

Detailed steps for positioning and securing the dispenser on the wall.

Connecting Electrical Components

Safety Instructions for Connecting

Safety guidelines for electrical connection.

Power Connection Precautions

Risks of Loose Power Connections

Risks of loose power connections and tightening requirements.

CrushingCutting Risk during Connection

Precautions for moving parts and cables during connection.

Power Supply Cable Connection

Connecting the Power Supply Cable

Steps for connecting the power supply cable.

Grounding and Cable Routing for Power

Requirements for grounding and cable routing.

PE and L1 N Conductor Connections

Connecting the PE Conductor

Steps for connecting the protective earth conductor.

Connecting L1 and N Conductors

Steps for connecting the L1 and N conductors.

Attaching and Daisy-Chaining Power Cables

Securing cables and looping for daisy-chaining.

DC Cable Connection

Connecting the DC Cable

Steps for connecting the DC cable.

DC Cable Connection Diagram

Diagram showing DC cable connections.

DC Conductor Connections

Connecting Protective Conductor (DC)

Steps for connecting the protective conductor of the DC cable.

Connecting DC+DC- Conductors

Steps for connecting DC+/DC- conductors to busbars.

Daisy-Chaining Additional DC Connections

Looping through DC connections for daisy-chaining.

Communication Cable Connection

Connecting the Communication Cable

Steps for connecting the communication cable (Ethernet/fiber-optic).

Ethernet Connection Diagram

Diagram showing communication cable connection.

EthernetFiber-Optic Cable Installation

Connecting Ethernet or Fiber-Optic Cables

Detailed steps for connecting Ethernet or fiber-optic cables.

Industrial Ethernet Connector Assembly

Instructions for assembling the Ethernet connector.

Cable Routing and Fastening

Cable routing considerations and fastening the cable.

Additional Dispenser Connections

Looping through Ethernet connections for daisy-chaining.

Commissioning the Dispenser

Switching On the Dispenser

Procedure for switching on the dispenser for commissioning.

Qualified Personnel for Commissioning

Reiterates that only qualified personnel can work on the dispenser.

Electric Shock Risk from Condensation

Warning about electric shock risk from condensation.

Injuries or Damages from Plug Handling

Risk of injuries or damages if the charging plug is not secured.

Dispenser Preparation for Switch-On

Switching Elements for Power-Up

Switching elements required for powering up the dispenser.

Automatic Startup Process

Describes the automatic startup process and readiness indication.

Operation Safety Instructions

General Operation Safety

Safety guidelines for operating the SICHARGE UC dispenser.

Accident Risks and Falling Parts

Protective measures against accidents and falling parts.

Defective Components Warning

Using only undamaged components.

Charging Cable and HMI Screen Safety

Access to Emergency OFF Button

Ensuring access to the emergency off button.

Safe Charging Cable Usage

Safety instructions for using the charging cable.

Safe HMI Screen Operation

Guidelines for operating the HMI screen safely.

Plugging in the Charging Cable

Procedure for Plugging in the Cable

Steps to plug in the charging cable to start charging.

HMI Screen Damage Prevention

Avoiding damage to the HMI screen with unsuitable objects.

Explosion or Electric Shock Risk

Risks of using damaged cables or sockets.

Charging Process Monitoring

Monitoring the Charging Process

Information on the "Start" menu for monitoring charging.

Vehicle and Connection Status Displays

Symbols indicating vehicle and connection status.

Progress and Charge Level Indicators

Overview of charging steps and charge level information.

Stopping and Unplugging the Charging Cable

Stopping the Charging Process

How to stop an active charging process.

Unplugging the Charging Cable

Steps to unplug the charging cable after charging is complete.

Explosion or Electric Shock Risk During Unplugging

Risks of forcibly removing the charging plug.

Alarm Management

Displaying Alarms

How alarms are displayed on the HMI screen.

Accessing Alarm History

Steps to navigate to the Alarms History menu.

Alarm History Menu

Display of recorded alarms with time, date, and status.

Operating the Service Menu

Selecting Options from the Service Menu

Steps to open the "Options" menu.

Checking Recorded Alarms

Procedure for checking recorded alarms.

Alarm Handling and Restarting Charging

Restarting Charging After an Alarm

Steps to restart charging after an alarm is deactivated.

Eliminating Alarm Causes

Importance of eliminating the alarm cause before deactivation.

Displaying Dispenser Information

Displaying Dispenser Information

Accessing and displaying dispenser information.

Charger Session Info Menu

Displays voltage and current values of the charging station.

Voltage and Current Values Table

Table listing values displayed on the HMI screen.

Displaying Energy Delivered

Accessing energy meter information for the last session.

Charging Process Trends and Advanced Options

Current and Voltage Trend Display

Accessing the display for charging voltage and current trends.

Selecting Advanced Options

Accessing advanced settings and controls.

Parameter Limits and Manual Control

Parameter Limits Adjustment

Allows changing limits on output power, voltage, and current.

Manual Control PID Interface

Interface for manual control of dispenser functions.

Sequential Charging Concepts

Bulk Charge Trickle Charge Scheme

Explanation of the two-stage charging process.

Sequential Charging Strategies

Rules for queue processing and charging prioritization.

Sequential Charging Example

Illustrates a sequential charging scenario with multiple dispensers.

Handling Alarms and Errors

Overview of Alarms and Diagnostics

General overview of alarm diagnostics and messages.

Emergency Stop Alarm Message

Alarm message for emergency stop activation.

Emergency OFF State Management

Describes the state and procedure to cancel the emergency off function.

Cabinet Door and Ground Fault Alarms

Cabinet Door Opened Alarm

Alarm message displayed when a cabinet door is opened.

Ground Fault Detection Alarm

Alarm message for ground fault detection.

Alarm State Cancellation and History

Canceling Alarm State

Procedure to cancel alarm state by disconnecting the vehicle.

Alarm Messages in History

Data displayed for each alarm in the history.

Alarm Messages and Error Handling

Lists alarm messages and error handling steps.

Maintenance and Service Safety

Safety Instructions for Maintenance

Safety guidelines for maintenance and service.

Maintenance Precautions

Falling Parts and Stumbling Risks

Warnings about falling parts and keeping work area clean.

CrushingCutting Risk and Safety Areas

Precautions for parts and creating safety areas.

PPE and Foreign Objects During Maintenance

PPE requirements and risks of foreign objects.

Maintenance Plan and Checks

Maintenance Plan Overview

Overview of maintenance measures and intervals.

External Checks of the Charging Station

Tests to be performed on the exterior of the station.

Checking Dispenser Exterior and Interior

Checking the Outside of the Dispenser

Maintenance interval and visual check items for the exterior.

Noise Testing

Checking the fan for unusual noises.

Testing the Inside of the Dispenser

Maintenance interval and checks for the interior of the dispenser.

Servicing the SICHARGE UC Dispenser

Cleaning the HMI Screen

How to clean the HMI screen properly.

Cleaning the Cabinet and Charging Cable

Guidelines for cleaning the dispenser cabinet and cable.

Cleaning the Ventilation Grille

How to clean ventilation grilles to ensure cooling.

Disposal Procedures

Disposing of Packaging

Recommendations for environmentally friendly packaging disposal.

Disposing of the SICHARGE UC Dispenser

Guidance on environmentally friendly disposal of the dispenser.

Recycling Considerations for Components

Recommended treatment for key dispenser components.

Service and Support Information

Customer Support Contact

Contact information and business hours for customer support.

Submitting a Support Ticket

Instructions for submitting a support ticket online.

Technical Specifications

Detailed Technical Specifications

Detailed technical specifications of the SICHARGE UC dispenser.

Supply Voltage Input

Input voltage and frequency specifications.

DC Output Specifications

Rated power, current, and voltage range for DC output.

Ambient and Mechanical Specifications

Specifications for ambient conditions, cabinet, weight, and cables.

Charging Current and Power Curves

Connection Plan Details

Table detailing connection types and cable specifications.

Charging Current Progression

Information on charging current progression based on voltage.

Power Curve Explanation

Figure illustrating power curve depending on charging voltage.

Declaration of Conformity

Compliance Statement

Statement of compliance with UL standards for charging stations.

Declaration of Conformity at a Glance

Lists directives met by the dispenser.

Abbreviations Used in Instructions

List of Abbreviations

List of abbreviations used in the instructions.