28
DETAIL A DETAIL B
39
21
20
51
20
39
21
TIGHTEN THIS HARDWARE FIRST.
TIGHTEN THIS HARDWARE SECOND.
TIGHTEN THIS
NUT LAST.
17mm
TOOLS NEEDED
24. In this Step you will begin to tighten the hardware from previous steps in the
following sequence: First tighten hardware shown in Detail A. Second,
tighten hardware shown in Detail B.
MAKE SURE HEADS OF THE BOLTS ARE
INSERTED INTO THE CUT OUT OF THE POLE, IF
NEEDED USE YOUR THUMB TO HOLD THE
BOLTS IN PLACE THEN USE A RATCHET AND
17MM SOCKET ON NUTS (21). TIGHTEN
HARDWARE TIGHT BUT DO NOT CRUSH TUBE.
NOTE