EasyManuals Logo

Sime DEWY Series User Manual

Sime DEWY Series
34 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLER INSTRUCTIONS
CONTENTS
1 DESCRIPTION OF THE BOILER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 94
2 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 98
3 CHARACTERISTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 108
4 USE AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pag. 111
IMPORTANT
When carrying out commissioning of the boiler, you are highly recommended to perform the following checks:
Make sure that there are no liquids or inflammable materials in the immediate vicinity of the boiler.
Make sure that the electrical connections have been made correctly and that the earth wire is connected to a
good earthing system.
Open the gas tap and check the soundness of the connections, including that of the burner.
Make sure that the boiler is set for operation for the type of gas supplied.
Check that the flue pipe for the outlet of the products of the combustion is unobstructed and has been properly
installed.
Make sure that any shutoff valves are open.
Make sure that the system is charged with water and is thoroughly vented.
Check that the circulating pump is not locked (CAUTION: Remember to release the pump coupled with the control
panel, if necessary, to protect the electronic control card).
Purge the system, bleeding off the air present in the gas pipe by operating the pressure relief valve on the gas
valve inlet.
Check that the syphened drip is fully filled with water. If necessary, fill it via the special opening.
FONDERIE SIME S.p.A. of Via Garbo 27 - Legnago (VR) - Italy declares that its hot water boilers, which bear the CE
mark under Gas Directive 90/396/CEE and are fitted with a safety thermostat calibrated to a maximum of 11C,
are not subject to application of PED Directive 97/23/CEE as they meet the requirements of article 1 paragraph
3.6 of the Directive.
DEWY - ENGLISH

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sime DEWY Series and is the answer not in the manual?

Sime DEWY Series Specifications

General IconGeneral
ControlDigital
Modulation Range1:5
ErP RatingA
CategoryBoiler
Fuel TypeNatural Gas
Efficiency93%
Installation TypeWall Mounted
Flue TypeRoom Sealed
ModelDEWY Series
Dimensions400x700x300 mm

Related product manuals