DC INVERTER U-MATCH AIR CONDITION MAINTENANCE
160
11. Connect the inlet
and out pipes of the
gas-liquid separator to
the system pipeline
Use gas welding to
weld the inlet and
outlet pipes of
gas-liquid separator
Weld by charging
nitrogen for protection,
with the nitrogen
pressure kept at
0.5±0.1kgf/c 󱚸(relative
pressure).
During heating, take
care to prevent the
substances around
from burn due to high
temperature.
12. Connect the power
cables of compressor
Insert the power
cables into terminal
strip according to
disassembly
procedures.
Use spanner to
tighten the compressor
cover.
13. Establish vacuum
through liquid valve
Establish vacuum
inside the system
through liquid valve.
14. Charge refrigerant
through liquid valve
Recharge the
refrigerant to the
system through liquid
valve.
The charge volume
must be identical to
the indications on
nameplate.
Charge refrigerant
through liquid valve

Related product manuals