DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
2
Main body of hoisting air conditioner
Bolt attachment
Bolt(attachment
[Fix the install cardboard]
Center of the ceiling
opening
Bolt of one of the angle of outlet pipe is fix
on the angle of the drainage slot
Install cardboard
Nut (supplied at scene)
Gasket (attachment)
Tighten (double nuts)
Hoisting stand
[Fix the hoisting stand firmly]
Insert
Gasket anchor board (attachment)
[Fix the gasket firmly]
Water lever
Polyethylene pipe
Figure 1-3-4
The primary step for install the indoor unit.
When attach the hoisting stand on hoisting screw, do use nut and gasket individually at the upper
and lower of the hoisting stand to fix it. The use of gasket anchor board can prevent gasket break
off.
Use install cardboard
Please refer to the install cardboard about the dimension of ceiling opening.
The central mark of the ceiling opening is marked on the install cardboard.
Install the install cardboard on the unit by bolt (3 piece), and fix the angle of the drainage pipe at the
outlet vent by bolt.
Adjust the unit to the suitable install place.
Check if the unit is horizontal.
Inner drainage pump and bobber switch are included in the indoor unit, check if 4 angle of every unit
are horizontal by water lever. (If the unit is slant toward the opposite of the coagulate water flow,
there may be malfunction of the bobber switch and lead water drop.)
Backout the gasket anchor board used to prevent gasket break off and tighten the nut on it.
Backout the install cardboard.
Cautions:
Please do tighten the nuts and bolts to prevent air conditioner break off.