EasyManua.ls Logo

Sinclair ASGE-18AI - Page 78

Sinclair ASGE-18AI
264 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
Figure 1-3-14
If gap is still left between the ceiling and the panel after screwing the screws, readjust the height of
the indoor unit body (Refer to Figure 1-3-15)
Figure 1-3-15
After fixing be sure no gap left between the ceiling and the panel
3 Wiring of the decoration panel.
Connect the joints for swing flap motor lead wire (at 2 places) installed on the panel (Refer to Figure
1-3-16)
Figure 1-3-16

Related product manuals