EasyManua.ls Logo

Sinclair ASGE-18AI - 3 REFRIGERATION PIPING WORK; 3.1 Refrigeration Piping Work Procedures

Sinclair ASGE-18AI
264 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DC INVERTER U-MATCH AIR CONDITIONERS INSTALLATION
2.5 Installation Clearance Data
Figure 2-5-1
3 REFRIGERATION PIPING WORK
3.1 Refrigeration Piping Work Procedures
1
Connection Pipe
The connection pipe must meet the following requirements. The three basic principles are that the
pipe shall be kept dry, clean and no leakage
.
Figure 3-1-1
Align the flared end of copper pipe with the center of threaded connector and use your hands to
securely tighten the flared nuts.
Tighten the flared nuts with torque wrench, until you hear a ‘KATA” sound from the torque wrench,
as shown in Fig. 3-1-1. See Table 3-1-1 for the torque required for tightening the nuts.

Related product manuals