EasyManuals Logo

Skyjack SJ46AJ User Manual

Skyjack SJ46AJ
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
Page 42 December 2007
SJ46AJ SJ51AJ SJ63AJ
FAMILIARIZATION
It is the responsibility of the operator to read, completely understand and follow all
instructions and warnings contained in this operating manual and on the MEWP.
2.4-5 Optional Equipment/Attachments
5
Test Work Light (If Equipped)
1. Select the on/off switch located on the
back of the light housing and switch it to
the on position.
Result: The light should turn on.
2. Turn the switch to the off position. Push
in platform emergency stop button.
3. Dismount the platform.
WARNING
Ensure that you maintain three points
of contact to mount/dismount platform.
Test All Motion Alarm (If Equipped)
WARNING
Be aware of overhead obstructions
or other possible hazards around the
MEWP when lifting.
1. Ensure path of intended motion is clear.
2. Activate any drive or lift functions.
Result: Alarm should sound.
3. Stop all platform motion.
Result: Alarm should stop.
NOTE
On MEWP with certain options, a ashing amber
light will accompany this alarm.
Test Flashing Amber Light (If Equipped)
1. Ensure path of intended motion is clear.
2. Activate any drive or lift functions.
Result: Light should ash.
3. Stop all platform motion.
Result: Light should stop ashing.
Work Light
Procedures Section 2 - Familiarization

Other manuals for Skyjack SJ46AJ

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ46AJ and is the answer not in the manual?

Skyjack SJ46AJ Specifications

General IconGeneral
BrandSkyjack
ModelSJ46AJ
CategoryBoom Lifts
LanguageEnglish

Related product manuals