EasyManua.ls Logo

Sleep Science SBKDCT2 - Synchronization Cable; Connecting and Operating; Velcro Securing Straps; Attaching Velcro Straps

Sleep Science SBKDCT2
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CUSTOMER SERVICE 1-800-723-0316 FROM 8:00AM TO 5:00PM PST MONDAY-FRIDAYCUSTOMER SERVICE 1-800-723-0316 FROM 8:00AM TO 5:00PM PST MONDAY-FRIDAY
PAGE 10 PAGE 11
SETUP
SETUP
Secure the adjustable base to the slat system by placing two Velcro Securing Straps at the head and two at the foot.
1
The Velcro Securing Straps are for zero clearance applications to secure the adjustable base to a bedframe slat system.
VELCRO SECURING STRAPS
OPTIONAL FOR SPLIT KING OR SPLIT CAL KING ADJUSTABLE BASE SETS
VELCRO SECURING STRAPSSYNCHRONIZATION CABLE
SYNCHRONIZATION CABLE
OPTIONAL FOR SPLIT KING OR SPLIT CAL KING ADJUSTABLE BASE SETS
2
3
4
1
Unplug the adjustable bases from the power outlets.
Connect the Synchronization Cable to an open port on the control box or
splitter cable on each adjustable base. Only one synchronization cable is
required.
If the adjustable base is equipped with bluetooth: disconnect 1 of the 2 units to
prevent malfunctions and phantom movements. This bluetooth device will have
a blue blinking lights.
Plug the adjustable bases back into the power outlet.
Check to ensure all cords are securely attached.
Both remotes will now operate both adjustable bases simultaneously.
The synchronization cable will link two adjustable bases in movement and features.
Open Port Open Port
Synchronization Cable
5