3 Configuring Integrated Plant Control SMA Solar Technology AG
8 IPC_STP-TI-en-14 Technical Information
☑ The tabs for entering the information on cables and the MV transformer are activated in the area Configuration.
10. Enter the key values for the cables used in the tabs Lines LV1, Lines LV2 and Lines LV3.
11. In the tab MV transformer, enter the key values for the MV transformer.
12. In the window Next steps, select the button [Download parameters].
☑ Sunny Design generates a CSV file containing the parameters that must be entered in the inverter.