EasyManua.ls Logo

SMA STP 110-60 User Manual

SMA STP 110-60
110 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Operating manual
SUNNY TRIPOWER CORE2
STP 110-60
STP110-60-BE-en-16 | Version 1.6ENGLISH

Table of Contents

Other manuals for SMA STP 110-60

Question and Answer IconNeed help?

Do you have a question about the SMA STP 110-60 and is the answer not in the manual?

SMA STP 110-60 Specifications

General IconGeneral
ModelSMA STP 110-60
CategoryInverter
Max. DC Voltage1100 V
Max. Efficiency98.7 %
Nominal AC grid frequency50 Hz / 60 Hz
Power factor at nominal power1
THD< 3%
Number of DC connections per MPPT2
Protection classI
Degree of protectionIP65
Operating temperature range-25°C to +60°C
Rated AC Power110 kW
Max. apparent AC power115 kVA
AC nominal voltage400 V
AC grid frequency range45 Hz to 65 Hz
Maximum AC Output Power110 kW
Nominal AC Voltage400 V
Frequency Range45 Hz to 65 Hz
DC nominal power111000 W

Summary

Safety

Intended Use

Specifies the authorized applications and environments for the product.

IMPORTANT SAFETY INFORMATION

Provides critical safety instructions and warnings for handling the product.

Product Overview

Interfaces and Functions

Details the communication interfaces and key functionalities of the product.

Mounting

Requirements for the Mounting Location

Specifies environmental and structural conditions for safe installation.

Mounting to Profile Rails

Instructions for attaching the product to mounting rails.

Mounting the Product on a Wall

Instructions for securing the product directly to a wall.

Electrical Connection

Requirements for the Electrical Connection

Outlines necessary conditions and standards for grid connection.

Connecting the AC Cable

Detailed procedure for connecting the AC power cable.

Connecting the Grounding

Instructions for establishing a proper ground connection for safety.

Connecting the Network Cables

Guide for establishing network connectivity for monitoring and control.

DC Connection

Steps for connecting the DC cables from the PV array.

Commissioning

Procedure for Commissioning in Systems Without System Manager

Steps for setting up the inverter without a central management system.

Procedure for Commissioning in Systems With System Manager

Steps for integrating and configuring the inverter with a System Manager.

Commissioning the Product

Final steps to activate and verify the product's operation.

Operation

Changing Operating Parameters

Guides on modifying product settings for optimal performance.

Configuring the Country Data Set

Setting region-specific parameters for compliance and grid compatibility.

Disconnecting the Product from Voltage Sources

Event Messages

Events

Lists and describes various error and status messages with corrective actions.

Maintenance

Safety during Maintenance

Critical safety precautions before performing any maintenance tasks.

Related product manuals