21
17. Inspect the O-ring seal for damage, replace if
needed, lubricate with fresh oil and reinstall reservoir
carefully to avoid damaging the O-ring. Tighten Cap
Screws to 4-6 lb-ft. (See Figure 2-4)
Figure 2-6
18. Position the Hydraulic control unit on the frame. Apply
LOCTITE™ 262 (Red) on the two (2) 3/8" Cap Screws
and insert through Lock Plate, frame and into endhead.
Torque Cap Screws to 30-32 lb-ft. (See Figure 2-6)
IMPORTANT:
After Cap Screws have been torqued
bend end of Lock Plate over tight against two flats of
each Cap Screw head. (See Figure 2-6)
NOTE: make sure Neoprene Pad is located between
power unit and mount. (See Figure 2-6)
19. Tighten Band Clamp with screw driver to 40 lb-in.
20. Place Power Unit assembly in place on A-Frame.
Apply LOCTITE
®
262 (Red) to two 3/8" Cap Screws and
torque to 35 lb-ft.
21. Place Lock Nut, with LOCTITE
®
262 (Red), on end of
Cap Screws and torque to 35 lb-ft.
CAUTION
LOCKTITE® 262 (Red) must be used on the 3/8"
Bolts and Lock nut!
LOCK NUT MUST NOT BE OMITTED.
MOUNTING BOLTS
NEOPRENE PAD
LOCK PLATE
BAND CLAMP
3/8" CAP SCREW
LOCK PLATE
FRAME
Figure 2-7
22. Reinstall 1" Pivot Bolt and tighten nut finger tight.
(See Figure 2-7)
23. Install Pivot Nut Plate and secure with 3/8" Cap
Screw.(See Figure 2-7)
Figure 2-8
24. Reinstall Hydraulic Tube in end of reservoir. Use
LOCTITE® 242 (Blue) on threads of fitting which mate
with nuts on Hydraulic tube. (See Figure 2-8)
Figure 2-9
3/8" CAP SCREW
PIVOT NUT
PLATE
LOCTITE HERE
LOOSEN HERE ONLY