EasyManua.ls Logo

SOCATA TBM 700 - Page 293

SOCATA TBM 700
670 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 4
NORMAL PROCEDURES
D.G.A.C. Approved
T B M
700 PILOTS INFORMATION MANUAL
Back to
Contents
Page 4.5.11
Rev. 6
PARTICULAR PROCEDURES
UTILIZATION BY COLD WEATHER ( 0 °C to 25 °C) AND
VERY COLD WEATHER ( 25 °C to 40 °C) (Contd)
ENVELOPE 1
The procedures hereafter supplement the normal procedures for the airplane
use when operating in the envelope 1 defined in Figure 4.5.1.
Preflight inspection
1 Remove any snow or ice from the wings, stabilizers and movable
surfaces.
Apply, according to the condition of runways and taxiways, the
procedures UTILIZATION ON RUNWAYS COVERED WITH
MELTING OR NOT TAMPED SNOW or the procedures
UTILIZATION ON ICY OR COVERED WITH TAMPED SNOW
RUNWAYS.
2 Carry out a complete rotation of the propeller to check its free rotation.
3 Do not perform a fuel draining. If the airplane is operating permanently
under negative temperatures, drainings will have to be performed
once a week after having parked the airplane in a heated hangar.
4 Remove chocks and / or release ties from the airplane.
5 Check the free deflection of the flight controls and of the elevator trim.
6 Check the free deflection of the power lever and of the propeller
governor lever.
Before starting the engine / Starting the engine / After starting the
engine
Apply normal procedures defined in Chapter(s) 4.3 and / or 4.4.

Related product manuals