52
Additionally Required Materials / Zusätzlich erforderliche Materialien / Matériaux
supplémentaires requis / Materiales adicionales necesarios / Materiais Adicionais
Necessários / Extra benodigde materialmen / Materiali aggiuntivi necessary / Materiały
wymagane dodatkowo / Další požadované materiály / Ytterligare materialkrav /
Materiale suplimentare necesare /
Други необходими материали
/ Yderligere
nødvendige materialer /
Πρόσθετα απαιτούμενα υλικά
/ Täiendavad vajalikud materjalid
/ Muut vaaditut materiaalit / Potrebni dodatni materijali / További szükséges anyagok
/ Papildomos reikalingos medžiagos / Papildus vajadzīgie materiāli / Dodatočne
požadované materiály / Dodatno zahtevani materiali / Ayrıca Gerekli Malzemeler /
Materiais Adicionais Necessários
No. Required Material Type
1 RCBO *
Type A RCD with a trip current of ≤ 30 mA;
2P and rated current ≥ 40 A for 7 kW, 4P and rated current
≥ 20 A for 11 kW, 4P and rated current ≥ 40 A for 22 kW
2 AC input cable
Three-core copper wire for single-phase,
five-core copper wire for three-phase;
Outer diameter: 12.5-18 mm;
Conductor cross-section for copper wire:
≥ 6 mm² for 7 kW and 22 kW, ≥ 4 mm² for 11 kW
3 Communication cable
Network cable CAT5 with RJ45 or two-core cable;
Conductor cross-section: 0.2 mm
2
4 RJ45 terminal(s) /
5 Meter (Optional) ** Contact with the installer for type recommendation
* Please choose appropriate RCBO according to local regulations.
** If OCPP scene is selected, a meter must be installed in the system.
Installation and Wiring / Installation und Verkabelung / Installation et câblage
/ Instalación y cableado / Instalação e Cabeamento / Installatie en bedrading /
Installazione e Cablaggio / Montaż i podłączenie kabli / Instalace a zapojení /
Installation och kabeldragning / Instalare și cablare /
Монтаж и окабеляване
/
Installation og kabling /
Εγκατάσταση και καλωδίωση
/ Paigaldamine ja kabiinis /
Asennus ja kaapelointi / Instalacija i Ožičenje / Telepítés és Bekötés / Montavimas ir
Sujungimas / Uzstādīšana un Kabeļus / Inštalácia a Kabeláž / Namestitev in Ožičenje /
Kurulum ve Kablolama / Instalação e Fiação
• Decide the application scenario before installation
EV-Charger
Home
loads
PV array
Inverter
Grid
RCBO
CT/
Meter
AC
distribution
box
Electricity
meter,
bidirectional
• Communication with CT/Meter
Home Scene: