Defines the intended audience and prerequisites for electricians performing installation.
Lists the specific terms and their meanings used throughout the manual.
Explains the meaning of various safety and informational symbols used in the manual.
Details the proper applications and conditions for the sonnen Batterie Evo system.
Outlines the necessary qualifications and certifications for installers.
Provides critical guidelines to prevent hazards during system operation and maintenance.
Warns about electrical shock hazards due to internal voltages, even when off.
Lists environments and conditions where the storage system must not be operated.
Instructs on safe handling procedures for the battery modules to prevent damage or hazards.
Provides essential steps for responding safely to a fire involving the storage system.
Presents detailed specifications for system (AC) and battery (DC) components.
Identifies and describes the main physical parts of the sonnen Batterie Evo system.
Explains the various warning labels and certification marks found on the storage system.
Details the required ambient conditions and procedures for storing the system and modules.
Covers regulations and precautions for transporting the hazardous lithium-ion battery modules.
Guides on physical installation, location selection, clearances, and securing the main cabinet.
Details how to connect the system to the grid, loads, and communication networks.
Provides step-by-step instructions for installing the sonnenModule 4 battery units.
Guides on installing and connecting the sonnen power meter for energy monitoring.
Details the sequence of steps required to safely turn on the sonnen Batterie Evo system.
Outlines the correct steps to safely turn off the sonnen Batterie Evo system.
Explains the meaning of different LED colors and their corresponding system status.
Covers the mandatory steps for system commissioning, including photo documentation and report submission.
Guides the installer through the software-based process for initial system configuration.
States that testing for multiple phase combinations according to AS/NZS 4777.2:2020 has not been conducted.
Specifies that uninstallation must be performed by an authorized electrician due to electrocution risks.
Instructs on the environmentally friendly disposal of the storage system and its batteries.