EasyManua.ls Logo

Sovol SV02 - Assembly; Gantry Frame Installation

Sovol SV02
17 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Front
Back
4pcs
M5X25
Gantry Frame Installation
4
1. Carefully remove all parts from the box
and remove any tape or padding from them.
a. Inspect each component and ensure
nothing was damaged during shipment.
Gantry
Base
2. Install the gantry frame (A) to the base frame (B)
a. On the gantry frame, make sure the nozzle assembly is to the front, and
the long vertical lead screw is to the back. On the base frame, make sure
the black belt cover is on the front, and the stepper motor is on the back.
b. Use the M5x25 screws (4) and lock washers (4). Lift the base frame.
Install the screws through the base frame into the threaded holes in the
gantry frame. Tighten with the M5 hex key (Allen) wrench.

Related product manuals