EasyManua.ls Logo

Star-Light ACM-09AR - User Manual

Star-Light ACM-09AR
192 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Star-Light ACM-09AR and is the answer not in the manual?

Summary

Safety Precautions

Safety Symbols and Installation Warnings

Explains safety symbols, installation warnings, and general safety rules.

Refrigerant Gas Handling Safety

Notes and precautions for handling fluorinated gases in the unit.

Product Components and Accessories

Included Accessories and Manuals

Lists all supplied accessories, manuals, and pipe assembly details.

Indoor Unit Parts Identification

Illustrates and labels the various parts of the indoor air conditioning unit.

Indoor Unit Installation

Indoor Unit Installation Summary

Provides a visual step-by-step overview of the indoor unit installation process.

Location Selection and Mounting Preparation

Covers location selection, prohibited areas, wall hole prep, plate mounting, and dimensions.

Refrigerant Piping and Drain Hose Setup

Details preparing refrigerant piping and connecting the drain hose.

Electrical Connections and Unit Mounting

Covers electrical safety, cable connections, wrapping, and mounting the indoor unit.

Outdoor Unit Installation

Location, Weather Considerations, and Drain Joint

Guidelines for location, weather, and installing the drain joint.

Anchoring and Cable Connections

Instructions for anchoring the unit and connecting signal/power cables.

Refrigerant Piping Connection

Pipe Cutting, Flaring, and Bending

Covers pipe cutting, burr removal, flaring, bending, and connecting to the indoor unit.

Connecting Pipes to Outdoor Unit

Step-by-step instructions for connecting pipes to the outdoor unit.

Air Evacuation and Refrigerant Management

Air Evacuation Procedure and Precautions

Outlines preparations, precautions, and steps for air evacuation.

Adding Refrigerant Calculation and Notes

Guidance on calculating and adding refrigerant based on pipe length.

Post-Installation Checks

Electrical Safety and Gas Leak Checks

Confirms electrical safety, checks for leakage, and performs gas leak detection.

Test Run and Finalization

Pre-Test Run Checks and Operation

Ensures all prior steps are complete and guides through initial unit operation.

Double-Checking Connections During Test Run

Re-checks refrigerant pipe connections for leaks during unit operation.

European Disposal Guidelines

Appliance Disposal Regulations and Options

Outlines regulations and options for disposing of the appliance responsibly.

Star-Light ACM-09AR Specifications

General IconGeneral
BrandStar-Light
ModelACM-09AR
CategoryAir Conditioner
LanguageEnglish

Related product manuals