EasyManua.ls Logo

Stats 5F63DE3 - Trampoline Mat Assembly

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
STEP 4
There are a total of 56 springs, For even distribution of spring tension and ease of assembly, the springs must
always be installed on opposite sides of the mat in an alternating manner, i.e. 1,then 29, followed by 15 and 43
as shown in below FIGURE. For ease of calculating springs, place the first spring beside a leg joint and in front
of the warning label.
Hint: The number of triangle-rings sewn onto the Mat is equal to the number of holes on the frame. If you
notice that you have miscounted a hole or triangle-ring, remove and reinstall the springs as necessary while
maintaining an even distribution of tension as explained above.
Heavy gloves must be used to protect your hands from pinch points during assembly and goggles
must be worn to avoid injuries to the eyes.
#15
4
1
#13
1
1543
29
1

Related product manuals