EasyManua.ls Logo

Stealth P-7 - INSTALL THE HANDLEBARS

Default Icon
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEALTH ELECTRIC BIKES OWNER’S MANUAL
V 2.4 PAGE | 7
Torque Specifications:
Bolt
Front axle
Axle lockout
Rear axle nuts
Stem handlebar clamp
Stem steerer tube clamp
V-boxx cranks (B52 and H47 only)
Schlumpf speed drive bolts (F37
only)
Magura brake lever clamps
Side cover fasteners
1. INSTALL THE HANDLEBARS
The handlebars come from the factory with all controls installed and ready. Ensure that a torque wrench is used when
tightening bolts so that the correct torque value is reached.
I. Remove the 4 bolts around stem cap using a 6mm Allen key.
II. Remove cap from stem.
III. Gently and carefully cut tape securing forks to stem and remove bubble wrap.
IV. Install handlebars on stem making sure that wires and cables are moving freely and not fouled in any way.
V. Loosely reinstall the end cap on the stem using the same 4 bolts.
VI. Check alignment of handlebars and preferred riding position.
VII. Evenly tighten bolts to correct tension (see Torque Specifications table).

Related product manuals