EasyManua.ls Logo

Steelcase Montage User Manual

Steelcase Montage
5 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Page 1 of 5
939504726 Rev D
®
If you have a problem, question, or request, call
your local dealer, or Steelcase Line 1 at
888.STEELCASE (888.783.3522)
for immediate action by people who want to help you.
(Outside the U.S.A., Canada, Mexico, Puerto Rico,
and the U.S. Virgin Islands, call: 1.616.247.2500)
Or visit our website: www.steelcase.com
©
2001 Steelcase Inc.
Grand Rapids, MI 49501
U.S.A.
Printed in U.S.A.
Flat Tool - ZFT
Montage
®
Locking Tile
Flat Tool - ZFTE
Question and Answer IconNeed help?

Do you have a question about the Steelcase Montage and is the answer not in the manual?

Steelcase Montage Specifications

General IconGeneral
BrandSteelcase
ModelMontage
CategoryIndustrial Equipment
LanguageEnglish

Summary

Montage Locking Tile Installation Guide

Product Introduction and Tools

Overview of the Montage Locking Tile and associated tools for installation.

Step 1: Locate Consolidation Point Tile

Identify the specific tile designated as the consolidation point within the installation area.

Step 2: Unpack and Identify Parts

Unpack all components and identify the locking tile, lock bracket, and rivets.

Step 3: Verify Mounting Plate Centering

Ensure the mounting plate is horizontally centered on the frame before proceeding.

Step 4: Install Lock Bracket

Attach the lock bracket to the frame by inserting its slots onto the mounting plate tabs.

Step 5: Drill Installation Holes

Use a 3/16" drill bit to create four holes in the frame guided by the lock bracket.

Step 6: Attach Lock Bracket with Rivets

Secure the lock bracket to the frame using four rivets.

Step 7: Install Locking Tile and Lock

Insert the locking tile into position and turn the key to secure it.

Step 8: Confirm Tile Security

Verify that the locking tile is firmly secured at both the top and bottom.