EasyManua.ls Logo

Stewart Warner 240 Series - User Manual

Default Icon
11 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
SERVICE
INSTRUCTIONS
240
SERIES ELECTRIC FUEL PUMP
6V
& 12V
Coil
Kits
KIT NO.
426947
(Fig.
2}
(A)
1-425617
Coil,
6
Volt
(B)
1-425651
Base
Gasket
(C)
1-425660 Switch
Gasket
(large)
(D)
1-425655 Switch
Gasket
(small)
(E)
2-425650
Switch
Sleeve
(F)
1-432975
Bowl
Gasket
KIT NO.
426948
(Fig.
2)
(A)
1-425664
Coil,
12
Volt
(B)
1-425651
Base
Gasket
(C)
1-425660 Switch
Gasket
(large)
(D)
1-425655 Switch Gasket
(small)
(E)
2-425650 Switch Sleeve
(F)
1-432975 Bowl Gasket
1.
Insert
coil assembly
(A)
into pump
with
notch
In
contact plate opposite that
of
switch
opening.
When
coil
is
properly indexed
and
seated,
the
terminals
and top
of
coil
will
be
clearly visible
through
the
switch opening.
2.
Replace tension washer
with
the
rounded por-
tion
to
the
coll.
3.
Replacenewgasket(B)anduslngtool(T-281843)
screw
in
coll
base
until
it
seats
firmly
against
gasket.
4.
Place
"O"
ring around protruding portion
of
piston tube.
5.
Place
washer
on top of "O"
ring.
TOP OF
COIL
FIGURE
1
6.
Install contact
sleeves
(E)
onto
the
coll ter-
minals
(Figure
1).
7.
Trip
actuator
arm of
switch upward
(Fig.
3).
8
Insert
piston.
9.
With
finger
pressure
hold piston
to its
upper-
most position, then
release
piston
approxi
-
mately
1/8".
THE
PISTON
MUST
BE IN
THIS
POSITION
TO
INSTALL
SWITCH.
f
/I
<MMM
*
FIGURE
2
10.
With
gaskets
(C) and (D) in
place,
press
switch
Into
pump
body
making
certain
the
switch
contacts engage with
the
contact
sleeves.
Due to
alignment
slot
on
switch,
it
can
only
be
installed
one
way.
11.
Replace
switch
cover
and
secure.
Note: vent
hole
in
cover must face downward.
FIGURE
3
12.
Insert
power spring after piston
and
replace
the
intake
valve.
Valve must
be
firmly
seat-
ed
against washer.
Use a
wrench
but
take
care
not to
over
tighten.
Do not
seat
valve
on
coil
base.
.-.
-,
13.
After
inspection
or
cleaning
of
sediment bowl,
assemble
filter
as
shown
in
Figure
4.
Make
certain
that
bowl
gasket
(F) is
properly
seat-
ed.
14.
Check operation
of
pump
before installation
on
vehicle.
IMPORTANT:
Always
use new
gaskets
and
seal
rings during
reassembly.
FIGURE
4
Printed
in
U.S.A.
P.N.
434357
STEUJRRT-UJflRnER
CORPORHTIOH
1826
W.
Diversey Parkway
Chicago, Illinois 60614
SER
4750
Question and Answer IconNeed help?

Do you have a question about the Stewart Warner 240 Series and is the answer not in the manual?

Summary

Fuel Pump Service Introduction

6 V & 12 V Coil Kits Overview

Details the available 6-volt and 12-volt coil kits for the electric fuel pump.

General Assembly Procedure

Provides a step-by-step guide for assembling the electric fuel pump unit.

Preparation and Disassembly

Preparation and Tools Required

Lists necessary tools and preparation steps before servicing the fuel pump.

Filter Bowl Disassembly

Instructions for removing the filter bowl and its components from the pump.

Intake Valve Disassembly

Details the steps to remove the intake valve from the fuel pump assembly.

Switch Disassembly

Procedure for safely removing the electrical switch assembly from the pump.

Component Disassembly and Service

Piston Disassembly and Service

Procedures for disassembling and servicing the fuel pump's piston component.

Coil Disassembly and Service

Steps to remove and service the pump's electrical coil assembly.

Regulator and Valve Disassembly

Instructions for disassembling the pump's regulator and valve components.

Checking and Repair Procedures

Switch Checking and Repair

Methods to check switch functionality and perform necessary repairs.

Intake Valve Checking and Repair

Procedures for verifying intake valve integrity and performing repairs.

Piston Checking and Repair

Steps to inspect the piston for wear and perform required repairs.

Component Checks and Assemblies

Coil Checking Procedure

How to test the coil for proper operation using a tester.

Regulator and Valve Checking

Procedures for checking the regulator and valve for damage or wear.

Regulator and Valve Assembly

Steps to reassemble the regulator and valve components.

Coil Assembly

Instructions for installing the coil into the pump body.

Switch and Piston Assembly

How to install the switch and piston assembly.

Intake Valve Assembly

Intake Valve Assembly Steps

Detailed steps for correctly assembling the intake valve.

Performance Testing

Establishing Standard Load Test

How to set up and perform standard load tests on the fuel pump.

Pressure Testing Procedure

Steps to test the fuel pump's pressure output.

Volume Testing Procedure

Method for testing the fuel pump's volume delivery.

Regulator Kit Service

Regulator Kit Disassembly

Instructions for disassembling the regulator kit components.

Regulator Kit Assembly

Steps for reassembling the regulator kit components.

Stewart Warner 240 Series Specifications

General IconGeneral
Series240
Housing MaterialCast Iron
Impeller MaterialBronze
TypeCentrifugal
Power SourceElectric