EasyManua.ls Logo

Sub-Zero Freezer User Manual

Sub-Zero Freezer
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
INSTALLATION INSTRUCTIONS
B UILT-IN R EFRIGERATION
Question and Answer IconNeed help?

Do you have a question about the Sub-Zero Freezer and is the answer not in the manual?

Sub-Zero Freezer Specifications

General IconGeneral
Temperature Range-5°F to 5°F (-20°C to -15°C)
Energy Star CertifiedMany models are Energy Star Certified; check specific model specifications
Defrost TypeAutomatic
Shelving MaterialStainless steel or tempered glass
Door ConstructionStainless steel
Installation TypeBuilt-in
CapacityVaries by model (typically 15 to 30 cubic feet)
Warranty2 to 5 years (varies by model and component)

Summary

Installation Recommendations

Installation Recommendations Overview

Importance of proper installation and seeking help from qualified personnel.

Required Tools and Materials

Comprehensive list of tools and materials for correct installation.

Installation Specifications and Site Preparation

Installation Specifications Basics

Verifying equipment match and checking model numbers before installation.

Site Preparation Guidelines

Ensuring correct rough opening, door clearance, and utility setup.

Model Dimensions Overview

Detailed dimensional data for various refrigerator and freezer models.

Core Installation Procedures

Electrical Requirements

Electrical supply specifications, circuit breaker, and grounding needs.

Plumbing Requirements

Guidelines for connecting the water supply line for ice makers.

Unit Unpacking and Initial Prep

Steps for safely unpacking and preparing the unit for movement.

Grille Removal Procedure

Instructions on how to remove the top grille assembly for access.

Anti-Tip Blocking Kit Installation

Securing the unit with an anti-tip device for stability and safety.

Unit Positioning and Leveling

Moving the unit into place and adjusting leveling legs.

Water Line Connection Details

Connecting the water supply line to the solenoid valve.

Final Unit Leveling and Kickplate

Ensuring the unit is level and installing the drain pan and kickplate.

Custom Panel Installation

Framed Panel Installation Basics

Procedures for installing custom wood panels on framed doors.

Framed Panel Specifications

Dimensions for framed door panels and handle recess locations.

Framed Panel Accessory Kits

Information on accessory kits for specific framed models.

Overlay Panel Installation Basics

Procedures for installing custom panels on overlay doors.

Overlay Panel Specifications

Dimensions for overlay door panels and grille panels.

Completing Installation and Adjustments

Side Panel Installation Options

Options and procedures for installing side panels.

Anchoring Unit to Cabinetry

Securing the unit to the cabinet using an anchoring kit.

Door Hinge Adjustment Procedure

Adjusting door hinges for proper alignment and operation.

90 Degree Door Stop Installation

Installing pins to limit door swing to 90 degrees.

Final Installation Checklist

A checklist for ensuring all installation steps are completed.

Service Information and Support

Post-Installation Checklist

Checklist of items to verify before calling for service.

Contacting Sub-Zero Support

How to contact Sub-Zero for service and customer support.

Related product manuals