EasyManua.ls Logo

Sub-Zero UC-15IP - Page 9

Sub-Zero UC-15IP
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
subzero.com
|
9
CARE RECOMMENDATIONS
Maintenance
PROLONGED SHUTDOWN
If the ice machine is to be removed from service for an
extended period or exposed to temperatures of 32°F
(0°C)
or below, follow the procedure for prolonged shutdown and
winterization.
Prolonged shutdown and winterization procedure:
1 Perform the cleaning and sanitizing procedure on page 7
to prevent mildew growth.
2 Disconnect electrical power at the circuit breaker or
service panel.
3 Turn off the water supply.
4 Remove water from the water reservoir.
5 Disconnect the incoming water supply line at the rear of
the unit and allow it to drain.
6 Disconnect the vinyl hose from the water pump and
allow it to drain.
7 Verify water is not trapped in any of the water supply or
drain lines. Compressed air can be used to blow out the
lines.
8 Use a spray bottle with a solution of 1 tablespoon (15 ml)
sanitizer to 1 gallon
(3.8 L) water and spray all interior
surfaces. Do not rinse, allow it to air dry.
9 Block the door partially open to provide air exchange
and prevent mildew growth.

Other manuals for Sub-Zero UC-15IP

Related product manuals