Do you have a question about the Suez Sievers UPW Boron Analyzer and is the answer not in the manual?
Method | Colorimetric |
---|---|
Cycle Time | 5 minutes |
Sample Flow Rate | 50-200 mL/min |
Power | 100-240 VAC, 50/60 Hz |
Communication Interface | RS-232, Ethernet |
Accuracy | ±5% of reading or ±0.5 ppb, whichever is greater |
Sample Temperature | 5 to 50°C |
Dimensions | 483 mm W x 178 mm H x 457 mm D (19 in x 7 in x 18 in) |
Weight | 13.6 kg (30 lb) |
Outputs | 4-20 mA |
Detection Limit | 0.5 μg/L B |
Details instrument and consumables specifications for the analyzer.
Lists and describes the main components of the analyzer, including fluidics and electronics.
Specifies environmental and location criteria for installing the Boron Analyzer.
Outlines requirements for sample water quality and flow for optimal analyzer performance.
Provides steps for safely unpacking and physically installing the analyzer unit.
Guides the user through installing reagent and necessary columns.
Details how to connect sample inlet, waste outlet, and electrical components.
Instructions for priming the reagent pump after installation and reagent setup.
Steps to initiate the analyzer's operation after setup is complete.
Explains the scientific basis and chemical reaction behind boron measurement.
Describes the process of zero and sample measurements using conductivity.
Details options for individual and averaged data output formats.
Introduces the analyzer's front panel interface and its key areas.
Explains how to navigate the analyzer's menus in both stopped and started states.
Covers setting analyzer modes and configuring individual sample streams.
Details setting up the 4-20 mA analog outputs for data reporting.
Explains how to configure alarm signals based on various analyzer conditions.
Covers configuring the RS-232 output for data communication.
Describes setting up binary inputs for control and outputs for status signals.
Strategies for configuring multiple sample streams for effective monitoring.
Techniques for monitoring rapidly changing or very low boron levels.
Procedures for monitoring, refilling, and warning levels for the boron reagent.
Instructions for replacing reagent and zero columns and updating installation info.
Guidance on removing and installing new peristaltic pump tubing.
Covers replacing and formatting the data card for storing measurement data.
A log for recording performed maintenance activities over the analyzer's life.
Lists error categories and their associated numerical codes for troubleshooting.
Explains how to view error/warning messages and their causes/corrections.