ADJUSTMENT 
The hot gas by-pass valve is adjusted during the manufacturing testing phase. 
As a  rule no adjustment is  required; anyway if  it is necessary the operation 
must be carried out by an experienced refrigerating engineer. 
WARNING 
the use of ¼” Schrader service valves must be justified by a real malfunction of 
the refrigerating  system. Each time a pressure gauge is connected, a part of 
refrigerant is exhausted. 
Without compressed  air flow  through the  dryer, rotate  the adjusting  screw 
(position A on the drawing) until the following value is reached: 
Hot gas setting :  
R134.a pressure 29.0 psig (+ 1.45 / -0 psi) [2.0 barg (+0.1 / -0 bar)] 
R407C pressure 65.3 psig (+1.45 / -0 psi)  [4.5 barg (+0.1 / -0 bar)]