Do you have a question about the SUNGOO SUNGO-OPT and is the answer not in the manual?
Do not open, disassemble, or repair SUNGO OPT; this is for trained personnel only.
Read and understand all notices, warnings, and related instructions before installation and use.
Strictly follow local electric codes and standards for fire and electric shock risks.
Installation must be operated by trained professional persons to avoid warranty issues.
Remove metal decorations before installation to reduce electric shock risks.
Ensure all cables are correctly and firmly connected before commissioning.
Do not connect or disconnect SUNGO OPTs underload; shut down inverter first.
Do not install or operate any SUNGO OPT that is damaged before installation.
Lists the necessary tools for installation, check, and replacement.
Outlines the general steps for installing SUNGO OPTs on PV module frames.
Guides on connecting the input cables from PV modules to SUNGO OPTs.
Explains how to connect the output cables of SUNGO OPTs in series to form strings.
Details connecting the assembled strings to the PV inverter or combiner box.
Instructs on the final step of turning on the PV inverter after system checks.
Specifies the correct order for connecting/disconnecting input and output cables.
Details the default and extended warranty periods and coverage for Sungo products.
Lists conditions and factors that may void the warranty or incur charges.
Outlines procedures for contacting service and handling failures during and after the warranty period.
Certifies that the SUNGO-OPT meets specified safety and performance requirements.
| Output Voltage | 220V AC |
|---|---|
| Frequency | 50Hz |
| Efficiency | 90% |
| Cooling | Fan Cooling |
| Protection | Overload, Overheat, Short Circuit |