EasyManua.ls Logo

Sunsystem SWP 2N 300 - Safety Relief Valve Connection and Guidelines; Safety Relief Valve Installation Diagram; Safety Valve Operational and Maintenance Guidelines

Default Icon
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
ТЕХНИЧЕСКИ ПАСПОРТ. ИНСТРУКЦИЯ за МОНТАЖ и ЕКСПЛОАТАЦИЯ
ТЕХНИЧЕСКИ ПАСПОРТ. ИНСТРУКЦИЯ за МОНТАЖ и ЕКСПЛОАТАЦИЯ
INSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUAL
1 Cold water inlet - water supply
2 Check (return) valve
3 Tee
4 Safety (relief) pressure valve
5 Cold water inlet - water tank
6 Stopcock (drainage)
Stop (Shut-off) valves should
never be installed between a
safety (relief) valve and the tank.
It is recommended once a year to
check the operation of the safety
valve.
3. CONNECTING OF SAFETY RELIEF VALVE TO WATER TANK