PN1243384 Price $10
MG SERIES BOILERS
INSTALLATION AND SERVICE MANUAL
FOR MODELS MG-50 TO MG-150
SEE REAR COVER FOR INDEX
Manufactured by
Allied Engineering Company
Division of E-Z-Rect Manufacturing Ltd.
Manufacturers of Gas and Electric Boilers, Stainless Steel Tanks, Heat Exchangers and Electric Boosters.
94 Riverside Drive, North Vancouver, B.C. V7H 2M6 Telephone (604) 929-1214 FAX (604) 929-5184
Branches: Calgary Edmonton Toronto
See Section 3.10 for Installer’s Checklist
See Section 4.3 for Service Checklist
This manual must only be used by a qualified
heating installer, service technician or gas supplier.

Other manuals for Super Hot MG series

Questions and Answers:

Super Hot MG series Specifications

General IconGeneral
BrandSuper Hot
ModelMG series
CategoryBoiler
LanguageEnglish

Summary

Dimensions and Specifications

About Our Manuals

User's Information Manual

Manual for owner/user on operation, maintenance, and emergency shutdown.

Installation and Service Manual

Manual for qualified installers, technicians, or gas suppliers for installation and service.

Lighting Instructions

Safety Instructions for Lighting

Critical safety warnings and procedures to follow before lighting the boiler.

General Lighting Procedures

Determining the correct lighting instruction section based on the boiler's ignition system.

Lighting: Standing Pilot

Step-by-step guide for lighting a standing pilot with a combination gas valve.

Lighting: Intermittent & Hot Surface Ignition

Instructions for lighting boilers with electronic or hot surface ignition systems.

Emergency Gas Shut-Off

Procedure for turning off gas to the boiler or performing an emergency shut-off.

Installation Instructions

Receiving and Inspecting Shipment

Instructions for inspecting the boiler shipment for possible damage upon receipt.

Installation Codes and Requirements

Overview of applicable national, provincial/state, and local codes for installation.

Location Requirements

Minimum clearances from the boiler to combustible materials for indoor installation.

Gas Service Piping

Guidelines for leak testing, pressure, and installation of gas piping to the boiler.

Air Supply for Combustion and Ventilation

Requirements for providing adequate air supply for combustion, dilution, and ventilation.

Corrosive Atmospheres

Identification of chemical vapors to avoid and their effect on the boiler.

Venting Requirements

Guidelines for providing adequate draft capacity and compliant vent installation.

Vent Terminal Information

Requirements for vent terminal location, clearance, and keeping it free from debris.

Removal of Existing Boiler

Steps for removing an existing boiler from a common venting system.

Automatic Vent Damper Installation

Instructions for installing and operating the automatic vent damper.

Blocked Vent and Flame Roll-out Safety Switches

Information on the function and importance of safety switches for vent blockage and flame roll-out.

Boiler Piping System

Requirements for connecting the boiler piping to heating coils and refrigeration systems.

Corrosion Prevention (Internal)

Recommendations for preventing internal corrosion, including water quality and tubing type.

System Operating Requirements

Guidelines for system water, loop type, and return water temperature to prevent issues.

Pressure Relief Valve Installation

Installation requirements and safety considerations for the pressure relief valve.

Electrical Wiring

Requirements for electrical wiring, bonding, grounding, and conforming to codes.

Startup Instructions

Pre-Startup Checks

Pre-startup checks including system filling, leak testing, and component verification.

Boiler Startup Procedure

Detailed procedures for starting up the boiler, including standing pilot and intermittent ignition.

Startup: Intermittent Pilot

Procedure for starting up the boiler with an intermittent pilot ignition system.

Startup: Hot Surface Ignition

Procedure for starting up the boiler with a hot surface ignition system.

Check Burner System

Inspecting burner system for condition, pilot flame, lifting, ignition, and flame color.

Aquastat Adjustment

How to set the aquastat for controlling main burner firing based on outlet water temperature.

Gas Manifold Pressure

Checking and adjusting gas manifold pressure for natural gas and propane models.

Check Input and Orifices

Verifying orifice size and input rate match application, including high altitude derates.

Check for Draft Hood Spillage

Procedure to test for combustion product spillage at the draft hood relief opening.

Check of Controls

Testing aquastat, safety high-limit, thermostat, and other system controls for proper function.

Check for Gas Leaks

Methods for identifying and testing for gas leaks in the boiler and piping.

Installer's Checklist

A checklist for installers to ensure all installation requirements and checks are met.

Service & Maintenance Instructions

Service and Maintenance Overview

General guidance on boiler maintenance, inspections, and the role of qualified personnel.

Cleaning Procedure

Step-by-step instructions for cleaning the boiler's flue gas passages and burners.

Service Checklist

A comprehensive checklist for qualified technicians to ensure proper boiler service.

Caution: Water Replenishment

Advice on avoiding unnecessary water replenishment to prevent corrosion and mineral buildup.

Refractory Handling Procedure

Safety precautions and first aid measures for handling refractory ceramic fibers (RCFs).

Boiler Water Flow Data

Replacement Parts

Wiring Diagrams

Troubleshooting Guide