EasyManua.ls Logo

Super Hot SG Series User Manual

Super Hot SG Series
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
PN2152451 Price $10
MG & SG SERIES BOILERS
INSTALLATION AND SERVICE MANUAL
FOR MODELS MG-50 TO MG-150 AND SG-135 TO SG-270
SEE REAR COVER FOR INDEX
Manufactured by
Allied Engineering Company
Division of E-Z-Rect Manufacturing Ltd.
Manufacturers of Gas and Electric Boilers, Stainless Steel Tanks, Heat Exchangers and Electric Boosters.
94 Riverside Drive, North Vancouver, B.C. V7H 2M6 Telephone (604) 929-1214 FAX (604) 929-5184
Branches: Calgary Edmonton Toronto
See Section 3.10 for Installer’s Checklist
See Section 4.3 for Service Checklist
This manual must only be used by a qualified
heating installer, service technician or gas supplier.

Questions and Answers:

Super Hot SG Series Specifications

General IconGeneral
BrandSuper Hot
ModelSG Series
CategoryBoiler
LanguageEnglish

Summary

MG Series Boiler Specifications

Standard Model Features

Lists features included in the standard model configuration.

Packaged Model Features

Details additional features included in 'PS' packaged models.

Minimum Installation Clearances

Specifies required clearances to combustible materials for safe installation.

Available Model Options

Outlines optional configurations and suffixes for boiler models.

SG Series Boiler Specifications

Standard Model Features

Lists features included in the standard model configuration.

Packaged Model Features

Details additional features included in 'PS' packaged models.

Minimum Installation Clearances

Specifies required clearances to combustible materials for safe installation.

Available Model Options

Outlines optional configurations and suffixes for boiler models.

Lighting Instructions

Safety Instructions for Lighting

Essential safety precautions to prevent fire or explosion during lighting.

General Lighting Procedures

Steps for lighting the boiler pilot and main burners.

Standing Pilot Lighting

Procedure for lighting boilers with a standing pilot ignition system.

Electronic/Hot Surface Ignition Lighting

Procedure for boilers with intermittent electronic or hot surface ignition.

Emergency Gas Shut-Off

Instructions for safely turning off gas to the boiler or for emergency shutdown.

Installation Instructions

Receiving and Inspection

Guidelines for inspecting the boiler upon delivery for damage or shortages.

Codes and Requirements

Overview of applicable national, provincial, and local installation codes.

Boiler Location Criteria

Requirements for selecting a suitable and safe installation location.

Gas Service Piping

Instructions for connecting and testing the gas supply piping to the boiler.

Air Supply and Ventilation

Requirements for providing adequate air for combustion and ventilation.

Corrosive Atmospheres Warning

Guidance on avoiding corrosive environments that can damage the boiler.

Venting Requirements

Specifications for proper installation of the boiler's vent system.

Automatic Vent Damper Installation

Instructions for installing and operating the automatic vent damper.

Safety Switches

Details on blocked vent and flame roll-out safety switches.

Boiler Piping System

Guidelines for connecting the boiler to the heating system's piping.

Internal Corrosion Prevention

Recommendations for preventing internal corrosion in the boiler system.

System Operating Requirements

Key requirements for the heating system's operation with the boiler.

Pressure Relief Valve

Installation and function of the pressure relief valve for safety.

Electrical Wiring

Requirements and procedures for connecting the boiler's electrical system.

Startup Procedures

Pre-Startup Checks

Essential checks and preparations before initial boiler startup.

Boiler Startup Sequence

Step-by-step guide for starting the boiler after installation.

Burner System Checks

Procedures for inspecting and verifying the proper function of the burner system.

Aquastat Adjustment

How to set the aquastat for controlling water temperature.

Gas Manifold Pressure Check

Procedure for verifying and adjusting gas manifold pressure.

Input Rate and Orifice Check

Ensuring correct gas input and orifice size for application.

Draft Hood Spillage Test

Procedure to check for combustion product spillage from the draft hood.

Control System Verification

Testing the operation of thermostats, aquastats, and safety controls.

Gas Leak Detection

Methods for checking gas piping for leaks after installation.

Installer's Checklist

A comprehensive checklist for installers to ensure proper installation.

Service and Maintenance

General Service Recommendations

Guidelines for routine inspection and maintenance of the boiler.

Cleaning Procedure

Steps for cleaning the boiler's internal components like burners and passages.

Routine Service Checklist

A detailed checklist for qualified technicians performing service.

Water Replenishment Caution

Warning about improper water replenishment and its effects.

Refractory Handling

Safety procedures for handling refractory materials (RCFs).

Boiler Water Flow Data

Replacement Parts

Wiring Diagrams and Instructions

Simplified Wiring Instructions

Basic guidance for connecting the boiler's electrical components.

Troubleshooting Guide

Related product manuals