EasyManua.ls Logo

Swing-N-Slide Kodiak PROJECT 512 - User Manual

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Kodiak
TM
NE 5010
Swing•N•Slide • 1212 Barberry Drive • Janesville, Wisconsin 53545
Visit our web site at: www.swing-n-slide.com or call us at 1-800-888-1232
ASSEMBLY INSTRUCTIONS
PROJECT 512
check out http://www.swing-n-slide.com/planupdates.htm
for updates to these instructions.
No. of Children: Up to 10
Min. Use Zone: 30' x 33-1/2'
Set Dim. 17'W x 21-1/2'L x 13'H
Est. Building Time: 4-6 hr.
30'
33-1/2'
Question and Answer IconNeed help?

Do you have a question about the Swing-N-Slide Kodiak PROJECT 512 and is the answer not in the manual?

Summary

Kodiak Project 512 Overview

Safety and Usage Guidelines

Installation Safety

Ensuring proper installation to prevent hazards and injuries.

Operating Safety

Guidelines for safe play and supervision to prevent accidents.

Safety Maintenance

Regular checks and upkeep for continued safe operation.

Shock-Absorbing Surfacing Requirements

Required Safety Installation Instructions

Ensuring proper installation with sufficient shock-absorbing material.

Loose Fill Material and Depth

Specifying materials and depths for fall height protection.

Tools and Hardware

Component Identification

Fastener Selection Guide

5;4 x 6 to 4 x 4 Fastener Use

Guidance on using fasteners for 5/4" x 6" boards with 4" x 4" uprights.

2 x 4 to 4 x 4 Fastener Use

Guidance on using fasteners for 2" x 4" boards with 4" x 4" uprights.

5;4 x 6 to 2 x 4 Fastener Use

Guidance on using fasteners for 5/4" x 6" boards with 2" x 4" boards.

Bracket System Assembly

Shelf-Loc and Wrap-Loc System

Explanation of how Shelf-Loc and Wrap-Loc brackets connect.

Correct vs. Incorrect Bracket Placement

Illustrations showing proper and improper bracket interlocking.

Frame Construction - Phase 1

A. Frame 1 Assembly

Detailed steps for constructing the first main frame section.

Frame Construction - Phase 2

B. Frame 2 Assembly

Detailed steps for constructing the second main frame section.

Frame Construction - Phase 3

C. Frame 3 Assembly

Detailed steps for constructing the third main frame section.

Frame Construction - Base Boards

Frame Construction - Section Attachment

Vertical Post Installation

F. Install 4 x4 Posts

Securing the main vertical 4" x 4" posts into the frame.

Frame Assembly - Final Connections

Deck Installation - Stage 1

G. Install Deck Boards

Attaching 5/4" deck boards to the frame structure.

Middle Rail Installation

Support Board Installation

Lower Rail Installation

Upper Rail Installation

Support Beam Installation - Stage 1

Swing Beam Preparation

Swing Hanger Installation

A-Frame Construction - Part 1

A-Frame Assembly - Part 2

A-Frame Assembly - Part 3

Barrier Board Installation

Rail Board Installation

Side Opening Option 1 - Ladder Assembly

Tarp Installation

Slide and Safety Handle Installation

Climbing Wall Assembly

Climbing Rock Attachment

Summary

Kodiak Project 512 Overview

Safety and Usage Guidelines

Installation Safety

Ensuring proper installation to prevent hazards and injuries.

Operating Safety

Guidelines for safe play and supervision to prevent accidents.

Safety Maintenance

Regular checks and upkeep for continued safe operation.

Shock-Absorbing Surfacing Requirements

Required Safety Installation Instructions

Ensuring proper installation with sufficient shock-absorbing material.

Loose Fill Material and Depth

Specifying materials and depths for fall height protection.

Tools and Hardware

Component Identification

Fastener Selection Guide

5;4 x 6 to 4 x 4 Fastener Use

Guidance on using fasteners for 5/4" x 6" boards with 4" x 4" uprights.

2 x 4 to 4 x 4 Fastener Use

Guidance on using fasteners for 2" x 4" boards with 4" x 4" uprights.

5;4 x 6 to 2 x 4 Fastener Use

Guidance on using fasteners for 5/4" x 6" boards with 2" x 4" boards.

Bracket System Assembly

Shelf-Loc and Wrap-Loc System

Explanation of how Shelf-Loc and Wrap-Loc brackets connect.

Correct vs. Incorrect Bracket Placement

Illustrations showing proper and improper bracket interlocking.

Frame Construction - Phase 1

A. Frame 1 Assembly

Detailed steps for constructing the first main frame section.

Frame Construction - Phase 2

B. Frame 2 Assembly

Detailed steps for constructing the second main frame section.

Frame Construction - Phase 3

C. Frame 3 Assembly

Detailed steps for constructing the third main frame section.

Frame Construction - Base Boards

Frame Construction - Section Attachment

Vertical Post Installation

F. Install 4 x4 Posts

Securing the main vertical 4" x 4" posts into the frame.

Frame Assembly - Final Connections

Deck Installation - Stage 1

G. Install Deck Boards

Attaching 5/4" deck boards to the frame structure.

Middle Rail Installation

Support Board Installation

Lower Rail Installation

Upper Rail Installation

Support Beam Installation - Stage 1

Swing Beam Preparation

Swing Hanger Installation

A-Frame Construction - Part 1

A-Frame Assembly - Part 2

A-Frame Assembly - Part 3

Barrier Board Installation

Rail Board Installation

Side Opening Option 1 - Ladder Assembly

Tarp Installation

Slide and Safety Handle Installation

Climbing Wall Assembly

Climbing Rock Attachment

Swing-N-Slide Kodiak PROJECT 512 Specifications

General IconGeneral
Product NameSwing-N-Slide Kodiak PROJECT 512
Model NumberPROJECT 512
CategorySwing Set
TypeWooden Swing Set
MaterialWood
Number of Swings2
Assembly RequiredYes
Swing TypeBelt
Additional FeaturesClimbing Wall, Slide
Recommended Age Range3 to 10 years

Related product manuals