Do you have a question about the Swiwin SW80B and is the answer not in the manual?
Describes initial steps for connecting data and power cables to the ECU.
Details connecting the ECU to power and other components.
Explains connections for throttle, pump, and GSU.
Guides on training the transmitter to the ECU by setting max, idle, and min values.
Details the procedure for priming the fuel pump and removing air.
Ensures all connections are properly placed before starting the engine.
Describes the order of powering up radio, receiver, and checking GSU sync.
Explains the initial stage of startup with minimal fuel flow and sizzling sound.
Details the engine RPM increase and fuel flow during preheat.
Describes the aggressive fuel ramping up to idle speed.
Guides the ECU training process for first-time engine use.
Lists the sequence for shutting down the turbine safely.
Explains the engine cool down process to prevent damage.
Introduces the 32-bit microprocessor ECU and its features.
Specifies voltage limits for receiver and power connections.
Details the function of each button on the GSU display.
Covers key startup parameters like Pump Voltage, RPM Ramps, and GlowPlug.
| Brand | Swiwin |
|---|---|
| Model | SW80B |
| Category | Industrial Equipment |
| Language | English |