OUTILS NÉCESSAIRES À L’ASSEMBLAGE:
MATÉRIEL NÉCESSAIRE À L’ASSEMBLAGE:
TOOLS REQUIRED FOR ASSEMBLY:
MATERIALS REQUIRED FOR ASSEMBLY:
1. PRÉPARATION DU SOL
PREPARING POOL SITE
ASSEMBLY OF FLEXIBLE PANELS
3. INSTALLATION DES COURROIES
STRAP INSTALLATION
4.
FOAM INSTALLATION
PRÉPARATION OF SAND BOTTOM
7. INSTALLATION DE LA TOILE
LINER INSTALLATION
TOPRAILS INSTALLATION
9. ENTRETIEN
10. GARANTIE
PISCINE EN BOIS RONDE
ÉTAPES D’INSTALLATION
INSTALLATION STEPS