EasyManua.ls Logo

Tamjets A4 Skyhawk - Page 9

Default Icon
37 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NOTE: Check to see that the vertical fin centerline is 90 Degrees to the work
surface using a square. IF it is not, shim UNDER the fuselage jig to accomplish
this before performing step 7. Maintain this alignment when installing wings and
horizontal stabilizers later !!!
7. Slide the wing tube clamps onto each of the 4 wing tubes.
8. Install Wing mounting bulkheads. Sand these bulkheads (if needed) to provide
1/32” clearance with fuselage)