EasyManua.ls Logo

Target 6-Cube - Page 9

Target 6-Cube
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
1. Push two short dowels into holes of one xed shelf.
2. Install dowels only into one top/bottom panel (both top/bottom panels are the same.)
3. Top/bottom panels have three holes on one side with the middle holes going through to the other side.
4. Unnished edges are shaded in light gray.
B
step 1.
(H5) x 2
short dowel

Related product manuals