EasyManua.ls Logo

TECO TK 2000 - Step 12: Final Reassembly and Checks

TECO TK 2000
15 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STEP n.
12
Reconnect all connectors. Then take the fan
support and fix it at the bottom part of chiller.
Attention: the front panel side must be insert in
the aluminum profile!
www.tecoonline.com | www.tecous.com
Rebuild the top part of the chiller following the
indicated sequence:
1. 4 INOX screw (fix the fan support on metal
cover)
2. Fan blade
3. Fan blade screw
4. Red ring (only for TK500 and TK1000)
5. Metal grid
6. Metal grid, 4 black washers and 4 screws
7. Conveyor
8. Air filter
9. Air filter grid

Other manuals for TECO TK 2000

Related product manuals