EQUIPMENT AND
INITIAL STEP
www.tecoonline.com | www.tecous.com
EQUIPMENT
- Big Crosshead Screwdriver
- Small Crosshead Screwdriver
SPARE PARTS
- Heater KRES02# (spare part)
- Nylon washer 3.5.038
- Ring nut 2.4.124
INITIAL STEP
- Turn OFF the chiller and let it OFF for twenty minutes before
proceeding
- Disconnect the chiller from power supply
- Never touch internal part or dismount chiller when it is connected to
power supply to avoid potential electric shock.
- Disconnect chiller from water pipe, by using squeeze tube clamps
and let some water flow away from chiller exchanger.
HEATER NYLON WASHER RING NUT